Victorian Renovation in London - Part 2
8 years ago
last modified: 8 years ago
Featured Answer
Sort by:Oldest
Comments (201)
- 8 years ago
- 8 years ago
Related Discussions
Victorian Renovation in London Part 3 - Finish line?
Comments (240)Thanks - I have already fitted a horizontal column radiator in the hall: I have done this in most common areas. It's out of shot in the photo. In terms of off-whites, we have not used any. Either pure brilliant white (kitchen, window woodwork etc), or F&B Ammonite (the grey on the staircase etc) are the neutrals. I looking at something for the kitchen as the pure white is a bit harsh....See MoreMassive renovation in West London : which colour box sash windows?
Comments (21)Thank you verdigrisjane. I understand your reservations but also it is brave to take the plunge. Especially if no one else on your street has it. We have decided with white as it needs to visually be in context with the other houses. If we has a larger facade or we not part of a building I would have opted for the braver charcoal choice. But I am happy with our decision....See MorePlease help me with Victorian 2nd reception room
Comments (21)It's a big project! Check out Resh's renovation project, here on Houzz. I'll see if I can find it for you, hold on.... Here it is, I think there are three parts. You might get some inspiration from it :-) https://www.houzz.co.uk/discussions/victorian-renovation-in-london-part-2-dsvw-vd~4911251...See MoreRenovation needed for London Victorian House
Comments (3)Hi, the side extension will require supporting the structure above. This will need structural steelworks to be inserted. depending on your budget there are a couple of ways this can be done , whether a beam is left showing (cheaper option) or the beam is hidden within the floor/ceiling of the first floor. alternatively the beam sits below the ceiling/floor (less expensive option). If you push the extension out into the current conservatory area, there will be more support needed and the overall cost will increase . some people refer to this as a wrap-around extension. I assume that the loft extension will not be budgeted at this stage. There are design fees and build costs. design fees differ depending on whether you just get the shell design or whether you have the entire interior layout carried out. This is the important part to consider. A good design can add value to your house and provide a solution that you may not have considered, so think about this when engaging your professional team. you will also need the services of a structural engineer to design support structure. ensure that the two professionals work together as I have seen designs where the engineer has not properly understood the design intent and the result is redesigning on site, which can be costly due to design changes. Allow £10-15k for design fees. if you engage a Project manager you will need more set aside, but this may save money in controlling building costs. I would put construction costs at between £60-£80k without the cost of your kitchen, but with electical supplies and plumbing services first fixed., so placed to positions. there will be the interior fitout, which may include underfloor heating, which is desirable feature for extensions, plus the kitchen cost. this can be anything from £8k to £100k depending whether you have a off the shelf or a bespoke designer kitchen. The first thing you need to do is to select your design team. Ensure that you have a team that you are comfortable with in understanding your wishes for the design. Dont just go with the big practices. often a small designer will give you more time and may have some great ideas. Make sure you have a contract with both the designer, but importantly with the builder, as disputes can arise and a contract is important in protecting all parties . I hope that this gives you some insight, you are entering into an exciting venture. I hope you manage to create your perfect home. best Rowland...See More- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years agolast modified: 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago
- 8 years ago


























nmlondon