UPDATE:
I still need to refresh the finish because I have some deep marks as I was taking off the epoxy. The sink stand is getting made. I will reset the drain too because it is slightly not centered in the hole.
Glued and setting up:
Joint:
Front:
Side that will show:
Drain set into place. It held water for 24 hours:
Front with olive oil:
Locking box joint:
Closeup of drain:
The sink will be offset to the left of this oiled backsplash and a stack of 2 drawers will be to the right of the sink of about the same dimensions. A wall mounted faucet will be on the left side of this backsplash, in the plainer area of stone:
This post was edited by enduring on Sat, Feb 23, 13 at 1:01
Q