We are in the very early planning stages (pre-design) of a full remodel of our converted bungalow. We aren't extending, but may want to remove some walls. We are trying to figure out at what point to engage a structural engineer, as we are aware that their services can be expensive. Should we be engaging them before we have any concep planner/ space planner/ architect involved? Or is it best to engage a structural engineer after a concept designs have been produced?
Isla Cherry
rinked
Related Discussions
£1500 for a new steel that architect and structural eng missed on plan
Q
Ideas and advice on kitchen structural openings
Q
Advice on underfloor heating with engineered wood
Q
Structural Warranty insurance for extension UK
Q
Black and Milk | Interior Design | London
siobhanmcgee90
Jonathan