Hole prepped and ready for the Patch on this Cedar Creek ceiling in Olathe, KS.
Contemporary Basement, Kansas City
The hole was prepped and waiting for the drywall patch to be "fitted". I would divide the job into 3rds, and this is near the end of the first 1/3rd of the job.
Brief job description: Prep hole, Patch, our special recipe for success blend of supplies and knowledge. After the texture had dried we painted the ceiling to match. This was a 99/100%. There is never 100% on any ceiling repair job unless the whole ceiling has a brand new layer of texture that is applied.
Customer were amazed at our quality work, and how the hole literally dissappeared before their eyes!
Atlas HD Films http://atlashdfilms.com