Fit kitchen before or after commissioning UFH

HU-428456975
3 years ago

Hi, i am building an extension, on the ground floor the kitchen / dining / living area has wet UFH, i used a standard concrete mix in lieu of screed. I have been told that the UFH should be switched on to remove moisture before fitting the tiles; even though the concrete was poured 2 months back. Any thoughts on this?


Also, i plan to fit the kitchen before the UFH is switched on, will this create issues later i.e. if the floor moves with the heat / moisture removal, will it impact the units that are fixed in the island area and against walls? Note: Where the kitchen units sit there are no UFH pipe below.


Thanks

Comments (5)

United Kingdom
Tailor my experience with cookies

Houzz uses cookies and similar technologies to personalise my experience, serve me relevant content, and improve Houzz products and services. By clicking ‘Accept’ I agree to this, as further described in the Houzz Cookie Policy. I can reject non-essential cookies by clicking ‘Manage Preferences’.