Full property renovation, Colchester, Essex
The property was built in 1966. It has been fully refurbished throughout with new kitchen units and appliances and a new bathroom suite and central heating system. Carpets were fitted throughout with the exception of kitchen, bathroom and toilet. The property had cavity wall insulation and loft insulation installed in accordance with current building regulations. Plastic roof line was installed after a roofing repair.
The central heating was installed by a Gas Safe installer and the electrical work by a certificated electrician who obtained a 'part P' certificate.
The central heating was installed by a Gas Safe installer and the electrical work by a certificated electrician who obtained a 'part P' certificate.
Project Year: 2017
Project Cost: £25,001 - £50,000