Clapham Basement Project and Full Renovation
This property was originally a three-story house, including five bedrooms and a loft conversion. Zebra were appointed to undertake the following works, floor by floor:
Basement: Installation of basement to include a wine cellar, TV room, utility room, bathroom, spare bedroom and lightwell.
Ground floor: New extension at the rear to include the installation of the new kitchen and large sliding door; Installation of the internal Crittall door between the sitting room and dining room; Entrance hallway and sitting room joinery and renovations.
First floor: Renovations to include Master bedroom and en-suite, bedroom one, family bathroom and study. The master en-suite was originally another bedroom; the redesign involved closing the doorway up from the hallway and addition of a new door for the master bedroom to create the master en-suite. New carpets were installed throughout.
Second floor: This is the existing loft conversion with three bedrooms and a bathroom. Zebra refurbished the bathroom, redecorated all the rooms, changed all the ironmongery on the doors and installed new carpet throughout.
Basement: Installation of basement to include a wine cellar, TV room, utility room, bathroom, spare bedroom and lightwell.
Ground floor: New extension at the rear to include the installation of the new kitchen and large sliding door; Installation of the internal Crittall door between the sitting room and dining room; Entrance hallway and sitting room joinery and renovations.
First floor: Renovations to include Master bedroom and en-suite, bedroom one, family bathroom and study. The master en-suite was originally another bedroom; the redesign involved closing the doorway up from the hallway and addition of a new door for the master bedroom to create the master en-suite. New carpets were installed throughout.
Second floor: This is the existing loft conversion with three bedrooms and a bathroom. Zebra refurbished the bathroom, redecorated all the rooms, changed all the ironmongery on the doors and installed new carpet throughout.
Project Year: 2021
Country: United Kingdom