Amtico form vinyl flooring including sub floor prep and damp proof membrane
Amtico Form in to a new build house.
First stage was to grind the screeded floor left by the builder, to remove any high points, weak screed and contaminants. After that we applied a paint on damp proof membrane to control any moisture left in the slab. The next stage was a 4-5mm coating of screed throughout. Finally the install commenced, with a straight plank in all of the rooms, and the bespoke herringbone pattern in the hallway with single plank border and trimmed boards to the other rooms.
First stage was to grind the screeded floor left by the builder, to remove any high points, weak screed and contaminants. After that we applied a paint on damp proof membrane to control any moisture left in the slab. The next stage was a 4-5mm coating of screed throughout. Finally the install commenced, with a straight plank in all of the rooms, and the bespoke herringbone pattern in the hallway with single plank border and trimmed boards to the other rooms.
Project Year: 2019
Country: United Kingdom
Postcode: B17 8BF